参数配置
CO2排放数据采样周期
设备能效默认指标配置
载货量
Login System
User Name
Password
气象数据上传
航线数据上传
Bunker Pre-Loading Plan management
Bunker Pre-Loading Record management
FUEL change record management
Query
New Plan
List
Map
Schedule time Ship name Fuel port name Recommended oil rate The amount of fuel Supplier Person in charge
1 total:pages
Export
Fuel filling ship name Fuel filling port Oil supply company Time start Time stop Product Quantity
1 total:pages
Export
Equipment Fuel switching mode Commence date&time Complete date&time Longitude Latitude Speed Bunker tank no. Sulphur content LSHFO Bunker tank LSHFO Fuel consumed SECA start date&time SECA end date&time Engineer's Signature
1 total:pages
Export
New&Edit
Ship name Fuel port name Date
Maximum oil rate T/H Recommended oil rate T/H Actual oil rate
Variety Begin Time Oil supplier
Number of oil loaded MT End Time Tanker
Draft before refuelling
(M)
Bow:    Refueling end draft
(M)
Bow:     
Stern:    Stern:   
Oil loading program Oil tank number Tank capacity
(M )
Existing capacity
(M )
Preloaded oil
(M )
Actual load oil
(M )
100% 90% Number % Number % Predicted oil level Number % Actual loading oil level
1 990.9
2 1080.9
Total:                      

Safety measures and instructions:    

Supervisor:    

Operate:    

Deck watch:     

Fuel filling port Date
Oil supply company Time alongside
Barge name Time completed
Product Time start
Quantity t Time stop
On duty

Deck:

Engine:

Equipment Fuel switching mode
Commence date&time Complete date&time
Longitude Latitude
Speed LSHFO Fuel consumed MT
Sulphur content % m/m LSHFO Bunker tank MT
Bunker tank no. SECA start date&time
Engineer's Signature SECA end date&time
Ship name Fuel port name Date
Maximum oil rate T/H Recommended oil rate T/H Actual oil rate T/H
Variety Begin Time Oil supplier
Number of oil loaded MT End Time Tanker
Draft before refuelling
(M)
Bow:    Refueling end draft
(M)
Bow:     
Stern:    Stern:   
Oil loading program Oil tank number Tank capacity
(M )
Existing capacity
(M )
Preloaded oil
(M )
Actual load oil
(M )
100% 90% Number % Number % Predicted oil level Number % Actual loading oil level

Safety measures and instructions:    

Supervisor:    

Operate:    

Deck watch:     

Fuel filling port Date
Oil supply company Time alongside
Barge name Time completed
Product Time start
Quantity t Time stop
On duty

Deck:

Engine:

Equipment Fuel switching mode
Commence date&time Complete date&time
Longitude Latitude
Speed LSHFO Fuel consumed MT
Sulphur content % m/m LSHFO Bunker tank MT
Bunker tank no. SECA start date&time
Engineer's Signature SECA end date&time